top of page
banner_producao_de_leite.png

Produção de leite

PLANTA DE BIOGÁS
SEKITA

SUMÁRIO

Local:
São João da Ponte - Minas Gerais

Aplicação:
Energia Elétrica

Substrato:
Dejetos bovinos

Capacidade Instalada:
1.000 kW (1ª fase)

Geração Anual:
3.319,3 MWh

Expansão:
-

processos_1.png
sumario_1.png

PROCESSOS

processos_1.png

DESAFIO

Silver Energy’s clients are oil and gas fields across North America. The company targeted one site in Alberta, Canada to install the EZ SmartTanks, where temperatureextremes were a foreseeable challenge.

DESAFIO

Silver Energy’s clients are oil and gas fields across North America. The company targeted one site in Alberta, Canada to install the EZ SmartTanks, where temperatureextremes were a foreseeable challenge.

DEPOIMENTOS  
O que nossos parceiros dizem sobre nós.

depoimento_img_1.png

Salving gas flaring and stranded gas problemswith the help of Bitcoin mining is a true win, winfor both energy and crypto industries.

Sergio Gerasymovych

CEO - Sekita Agronegócios

depoimento_img_2.png

CASOS
Onde nossas parcerias geram alternativas.

Case | Confinamento Bovino

PLANTA DE BIOGÁS

SANTA MÔNICA

 

São João da Ponte - Minas Gerais

Aplicação: Energia Elétrica

Substrato: Dejetos bovinos

Capacidade Instalada: 1.000 kW (1ª fase)

Geração Anual: 3.319,3 MWh

Expansão: -

Case | Produção Ovinos

PLANTA DE BIOGÁS

SANTA TEREZINHA

São João da Ponte - Minas Gerais

Aplicação: Energia Elétrica

Substrato: Dejetos ovinos

Capacidade Instalada: 750 kW (1ª fase)

Geração Anual: 2.920,0 MWh

Expansão: -

Case | Produção de Leite

PLANTA DE BIOGÁS

SEKITA

 

São João da Ponte - Minas Gerais

Aplicação: Energia Elétrica

Substrato: Dejetos bovinos

Capacidade Instalada: 560 kW (1ª fase)

Geração Anual: 4.110,0 MWh

Expansão: 1.120 kW

bottom of page